Modular-spaced workover rig:
Workover equipment designed in equipment packages or modules that are light enough to be lifted onto an offshore platform by a platform crane.In most cases, the maximum weight of a module of 12,000 pounds.
Once lifted from the work boat, the rig can be erected and working within twenty-four to thirty-six hours.